Builders in Romford




Below is some examples of our work, for more info please do call me and I will be happy to give you a quotation.

Replacement windows

The house was built in the 1970 with wooden windows and single glazing. I was asked for a quotation to supply and install best quality window and doors in white UPVC, as well as providing and cutting out a window within the bathroom. After the windows and doors where installed the client had to turn the room stat down from 20 Deg to 17 Deg and remarked on how quite it was within the home.

Replacement windows

 

Rear refurbish to house built in 1953

The rear of the property had wooden windows and doors which have been replaced with white UPVC. There is also a small extension to the kitchen, providing a utility area from a rear porch which only housed the dustbins. Also the rear lawn area was excavated and a patio constructed making this a useful area for the family and dogs.

Replacement windows and Patio

 

The timber artist studio

We were asked by a local artist to provide an area within his home to enable him to paint. On visiting his home the only place to provide this area was in his rear garden, which was over grown with shrubs. After clearing the lower end of the garden an area of 4.0 x 3.0 was exposed. We designed and built a timber framed building which had a flat roof. The walls, ceiling and floor where highly insulated, also there was a requirement for natural light which was provided by a Velux sky light for a flat roof construction, with a large glazed area to the front. There was also a requirement for natural electrical lighting which was provided by four track lights around the sky light.

Artist shed

 

Project management.

A grade one listed school in Kent had a major roof refurbishment costing £1,000,000. This included stripping the existing covering consisting of tiling, slating and three layer felt and overhauling the chimneys and guttering. All listed timber windows had to be inspected and overhauled to working order and then painted. The existing building had to be covered with a temporary roof, while the extensive works where carried out in two phases which lasted nine months.

Referb school

Please do call me and I will be happy to give you a quotation for any work that you may need.

 


 
spl building